PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Conduit for the temporary power Facing South  (800x600).jpg Excavation at room 173 for the underground roughing Facing South-East (800x600).jpg Installing wall forms along column line 6.5 (G-D) Facing South-West (800x600).jpg Ground rod Facing South (800x600).jpg Installing wall forms along column line 6.5 (G-D) Facing East (800x600).jpg Welding Derrick -2 3rd Floor Facing West  (800x600).jpg Finished installing the wall forms along column line 6.5 (G-D) Facing South-West (800x600).jpg Installing Steel angles at Elev. 1,2,3 for the 3rd Floor Metal decking Facing North-West  (800x600).jpg Underfround roughing at Room 173 Facing East (800x600).jpg
Previous pageNext page Installing wall forms along column line 6.5 (G-D) Facing East (800x600)
Installing wall forms along column line 6.5 (G-D) Facing East (800x600)